Search results

Jump to: navigation, search
  • ...) being panelled in plywood. It is double-layered, with an inner and outer panel of either drywall or plywood and an internal space of approximately four in ...space and command centre for the Astronauts, containing their kitchen and control units. Additionally, the [[Airlock]] was off of the [[Interlock]]. The [[L
    12 KB (1,867 words) - 01:09, 30 November 2022
  • ...TTLE undocking has just been completed, '''hold further steps until ground control confirms that the shuttle has completed the de-orbit burn.''' Keep Status s # Apply 3 m/s/s thrust for the required time (consult mission control)
    1 KB (204 words) - 14:33, 20 April 2010
  • # Toggle F5 to bring up the AYSE docking systems control panel. # Set Thermal Control Measures to OFF.
    2 KB (360 words) - 12:35, 20 April 2010
  • ...bort is declared, the astronauts can leave the Habitat and walk to Mission Control. ...Drive]], and return to Earth in the most speedy fashion possible. Mission Control must continue to monitor their progress and prepare a shuttle launch to ren
    1,003 B (148 words) - 16:27, 26 April 2013
  • ===BREAKER PANEL OPERATION=== ...ed, follow [[P4.1.3]] and inform Mission Control of the situation. Mission Control will inform you as to the nature of the emergency and might order [[P4.3.2]
    1 KB (210 words) - 20:43, 5 October 2013
  • ...Mutinying [[Astronauts]], [[Terrorist|Terrorists]] or Hijackers. [[Mission Control]] is to immediately get in contact with the hijackers/mutineers. They must ...r oxygen levels in the mutineers' module. Attempt to gain complete remote control of the Habitat. Seal off the interlock. Offer to inject radiation into the
    2 KB (293 words) - 14:36, 25 October 2014
  • ...ostics upon it. If it is software or a control panel, consult with Mission Control, the Mission Commander, or someone knowledgeable in the computer system abo ...re needed in the same form that the original was attached. Consult Mission Control and your Astronaut or Flight Team Training for replacement of parts.
    1 KB (187 words) - 20:16, 26 April 2013
  • ...5 minutes cool-down cause they just got there or finished wiring a control panel etc.), after that, a warning will be issued (i.e. they will be urged to sig
    8 KB (1,380 words) - 18:02, 25 February 2010
  • {{TF|name=[[Control Panel]]|lead=Jim Magwood|purp=Interface switches, LEDs, and other physical object
    3 KB (367 words) - 17:28, 27 November 2015
  • On the ground in [[Mission Control]], [[Eric Weese]] was [[Mission Control Commander]] and [[Avi Caplan]], [[James Clark]], [[Dominik Ken]], [[Thomas ...e, they proceeded to [[depressurize]] the [[interlock]] (via the [[control panel]]). The two suited astronauts entered the longhouse to assess the damage. T
    4 KB (607 words) - 18:14, 30 March 2010
  • Part of the 2015 control panel task force.
    2 KB (216 words) - 17:32, 31 May 2019
  • ...or panels are Cat-5 cables run over the roof of the habitat and into the [[Control Room]] where they are soldered to the [[EECOM]] Door Card and connected to ...re or atmospheric differential between the two rooms monitered by the door panel is large, the red LED will light up. If the differential is minimal the the
    2 KB (467 words) - 21:50, 6 May 2010
  • *The patch panel and network hub that services the [[Spacesim network|network]] at [[440 Alb ...ights and plugs in the [[Interlock]], the [[Longhouse]], and [[Command and Control]], and a fourth switch controls the [[Hotlab]], [[Engineering Closet]], [[A
    2 KB (351 words) - 20:54, 27 November 2015
  • ...vious tradition among [[Flight Director]]s of calling experts when Mission Control was out of its depth in a situation; this consisted of telephoning the [[Si ...ontrol was transferring from the [[Spacesim Office]] to night-time Mission Control at [[440 Albert]].
    2 KB (303 words) - 21:30, 21 March 2011
  • ...s, as well as the installation in [[Command and Control]] of a large patch panel. This allows the [[astronauts]] to actively replace parts of the network or
    3 KB (524 words) - 18:06, 27 November 2015
  • Mission Control should have given us a better briefing, but had no clue we were doing an E Control Panel - get it working<br>
    4 KB (662 words) - 03:44, 7 May 2010
  • **Mission Control *There are now 6 or 7 working keys on the panel above the engineering computer
    1 KB (199 words) - 17:44, 31 May 2019
  • *More work happened on the engineering control panel *Mission Control
    17 KB (2,507 words) - 19:18, 27 November 2015
  • ...ame=Control panels|lead=Charles Holtforster|purp=To make an actual control panel for the engineering software.|memb=Charles, Ian, Tristan, Emily}}
    3 KB (530 words) - 17:45, 31 May 2019
  • *The engineering control panel had more work done on it, there is still no ETA on its being finished
    1 KB (185 words) - 01:11, 30 November 2022
  • ...ame=Control panels|lead=Charles Holtforster|purp=To make an actual control panel for the engineering software.|memb=Charles, Ian, Tristan, Emily}}
    2 KB (264 words) - 17:45, 31 May 2019

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)