Difference between revisions of "November 22 2013"

From OCE Space Simulation
Jump to: navigation, search
(Mini mission notes)
 
Line 1: Line 1:
 
'''Events'''
 
'''Events'''
 +
 +
''Mini Mission''
 
*There was a mini mission for the moon takeoff procedure started and will be finished at a later date
 
*There was a mini mission for the moon takeoff procedure started and will be finished at a later date
 
**Astros (who were sitting at the three new computers in MC)
 
**Astros (who were sitting at the three new computers in MC)
Line 10: Line 12:
 
***[[Nathan Kelly|Nathan]] was monitoring engineering
 
***[[Nathan Kelly|Nathan]] was monitoring engineering
 
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working
 
***[[Spencer Whitehead|Spencer]] was monitoring eecom even though it isn't working
 +
 +
''Hab drainage pipe''
 +
*There was a successful test conducted
 +
*The edges for the holes are being smoothed out and it should be glued in place on [[November 29 2013]]
 +
 +
''Rover''
 +
*[[Jared Kelly|Jared]] and [[Maxim Billig|Maxim]] tested the motors and found out that they work
 +
*[[Arrian Amir-Rafiei|Arrian]] talked with [[Maxim Billig|Maxim]] about it (specifics will be found out ASAP)
 +
 +
''Keboards''
 +
*There are now 6 or 7 working keys on the panel above the engineering computer

Revision as of 21:44, 24 November 2013

Events

Mini Mission

  • There was a mini mission for the moon takeoff procedure started and will be finished at a later date
    • Astros (who were sitting at the three new computers in MC)
      • Matt M. as hab commander and eecom monitor even though eecom isn't working
      • Wade was the pilot
      • Noah was the engineering
    • Mission Control
      • Larissa was monitoring orbit and helping Wade )majorly)
      • Dawn started out as MC commander but was replaced by Jared after she had to leave
      • Nathan was monitoring engineering
      • Spencer was monitoring eecom even though it isn't working

Hab drainage pipe

  • There was a successful test conducted
  • The edges for the holes are being smoothed out and it should be glued in place on November 29 2013

Rover

  • Jared and Maxim tested the motors and found out that they work
  • Arrian talked with Maxim about it (specifics will be found out ASAP)

Keboards

  • There are now 6 or 7 working keys on the panel above the engineering computer