Mission Alpha

From OCE Space Simulation
Revision as of 18:45, 11 February 2006 by Foo1 (Talk | contribs)

Jump to: navigation, search

A Mission Alpha was a mission Dry-run. This year's mission alpha is mission Daedalus). It's destination was pluto.

Historical

These were typically run about 1 month before the actual mission, and lasted about 4-6 hours in duration. The purpose was to test out all equipment, and discover any problems or areas lacking proper planning. It also was an excellent opportunity to test the level of training for both Astronauts and Mission Control staff.

In the 2001-2002 year, a Mission Beta was run. The Mission Alpha occured while the Habitat was still under construction, and as such a second dry run was needed closer to the mission date.


Mini-Missions

Mini-missions were historically an EEP activity for older classes. In recent years, Space Sim has taken to calling the dry-runs 'Mini-Missions' instead of Mission Alpha.